In car park 1 (lower level), there are 60 charging points provided by the airport and Bonn's municipal utilities with a charging capacity of up to 22 kW and a type 2 socket. These can be activated using all standard charging cards, a QR code or the SWB eCharge app.
Additional charging points are available in car park 3 on level 0 (10 points) and in car park 2 on level 6 (10 points), each with a charging capacity of up to 3.7 kW via a type 2 socket. Activation is the same as for the charging points in P1.
No blocking fee is charged in P1, P2 and P3 when activating via QR code or the SWB eCharge app.
Existing customers of the old TankE network app can continue to use it until 31 March 2026.
Parking rates